30. SEQUENCE OF OPERATION –
HEATING
On a call for heat from the thermostat, the induced
draft blower is energized. Once sufficient draft is
established, the pressure switch contacts close and
the ignition system is energized. The direct spark
ignitor will be energized allowing gas to flow. At the
same time the main valve is energized, a 30-second
blower delay timer is activated.
After this delay, the heating speed blower relay
energizes. The blower will begin operating and
remain in operation until the set delay time after the
call for heat has been satisfied. (See Tables 10-15
for selectable blower off time delays.) This timing
sequence guarantees blower on, blower off operation.
This unit is equipped with a flame roll-out switch,
which is wired in series with the control circuit. This
is a manual reset switch and is used for the purpose of
preventing possible fire hazard in the event of a system
malfunction. If this switch has opened the control
circuit, there could be a possible system malfunction.
Some of the conditions that might cause a roll-out
to occur are blockage or sooting of primary heat
exchanger, overfiring of furnace due to improper main
burner orifices or incorrect manifold pressure,
insufficient combustion air, or installation deficiencies
with respect to return air duct design or sizing.
Once the problem has been resolved, reset the switch
by pressing down on the reset button on top of the
switch. See Figure 19 for additional information.
31. SEQUENCE OF OPERATION –
COOLING
On a call for cooling from the room thermostat, the
high speed blower relay will be energized as well as
the compressor contactor. Following termination of the
cooling cycle, the blower motor will continue to run for
one minute.
See Figure 19 for additional information.
The unit may be equipped with a low ambient control
for lower outdoor temperature operation in the cooling
mode. If equipped with this optional control the
condenser fan will not operate immediately upon
compressor start-up, and will cycle on and off until the
condensing pressure remains above 180 PSIG. LAC
energizes the fan motor at 280 PSIG, de-energizes at
180 PSIG.
FIGURE 19
SEQUENCE OF OPERATION
ELECTRONIC BLOWER CONTROL
Action System Response
Thermostat calls for heat
(W terminal is energized).
• Combustion air blower is energized.
• Air proving switch makes. Airflow is established.
• Ignition system is energized.
• Gas valve opens and main burner lights.
• Heat fan on delay timing begins. When timing is complete, the circulating fan is
energized at heat speed.
Thermostat ends call for heat. • Ignition system is de-energized and gas valve closes.
• Combustion air blower is de-energized after postpurge timing.
• Heat fan off delay timing begins. When timing is complete, the circulating fan is
de-energized.
Thermostat begins call for cool
(G and Y terminals re-energized).
• Cooling contactor is energized.
• Circulating fan is energized on cool speed after cool fan on delay timing.
Thermostat begins call for fan
(G terminal is de-energized).
• Circulating fan is de-energized
Limit (flame rollout) opens. • Thermostat and ignition system are de-energized and gas valve closes.
• Combustion air blower and circulating fan heat speed are energized.
Limit (auto reset) or flame rollout
(manual reset) circuit closed.
• Combustion air blower remains energized for postpurge timing.
• The circulation fan remains energized for the selected delay off timing.
• Normal operation resumes.